OpEx Power Savings: Stop Bleeding Money on Excess Pressure

Pipelines often pump higher than needed, then bleed pressure at the destination — wasted energy spend. Lean closed-loop profiles cut power cost while still meeting contracted volumes.

Download

Download the PDF now — ungated, no form required.

Most lines run “safe-high” pressure so operators can guarantee delivery under uncertainty. That margin becomes kWh you pay for — and then dissipate. Closed-loop control holds leaner profiles that still hit nominations, lowering energy per barrel on existing pumps and SCADA.

Results highlighted in the one-pager

  • Up to 16% power cost reduction
  • Lean pressure profiles with lower energy per barrel
  • Contracted volumes still met — lean pressure ≠ less delivery
  • No CapEx required — deploys on existing infrastructure